Showing posts with label electrification. Show all posts
Showing posts with label electrification. Show all posts

Wednesday, April 22, 2009

Earth Day 2009: Focus on Electricity

NOTE: We've moved! Visit us at the California High Speed Rail Blog.

Ever since 1970, April 22 has marked Earth Day in the United States. The objective has always been to raise awareness of environmental issues and to prompt individuals to take actions that benefit the environment in some way.

Today marks the first Earth Day of the Obama administration. The President will head to Iowa to promote renewable electricity generation, specifically wind farms. This is part of a larger strategy to gradually wean the US economy off fossil fuels in general and oil in particular. Reducing US dependence on these finite resources is an essential contribution to both climate policy and national security. The administration's energy-cum-green-collar-jobs legislation is already making its way through Congress, albeit slowly.

Of course, any sensible energy policy needs to address not just how electricity is generated but also the total amount used. Without aggressive conservation, renewable electricity - hydro, wind, solar, geothermal, biomass - will always struggle to cover more than a tiny fraction of total demand.


Florida Power & Light has embarked on a $200 million project to install "smart meters" in all homes in Miami-Dade county. Each meter contains a WiFi transceiver that allows consumers to track their electricity usage with software installed on their PC. Knowing when they consume which amount of electricity on a given circuit - mapped to specific rooms or appliances - makes it much easier for them to identify and eliminate power hogs.

California's Bay Area and San Diego are just as exposed to the threat of slowly rising sea levels as south Florida. Yet it is air conditioning demand in the hot inland areas of both states that places enormous strain on the utility companies on the 10 hottest days of the year. In California, aggregate demand can jump by as much as 50% when people return home in the late afternoon and switch on their central A/C unit, often at full power to bring temperatures back down quickly. According to a KQED Quest radio report, simply selecting a device that is optimized for the temperature and humidity range in a particular area can save 20% on A/C-related electricity consumption. There are more than just cost savings here, because the rarely-used power plants that exist purely to cope with extreme peak demand have to deliver that power quickly and reliably - which means using gas turbines. While these could run on stored biogas, the regulatory structure still favors the use of fossil natural gas.

There are plenty of other examples of scope for structural reductions in electricity consumption in California:
  • for new buildings, solar architecture encompasses everything from avoiding large south-facing windows to insulation to self-shading, water features and vegetation, all in an effort to keep the indoor and interior courtyard areas naturally cool during the summer months
  • in some locations, apartment complexes and businesses can already choose to deploy green roofs with drought-resistant plants supported by recycled water to provide natural insulation
  • the pumps used to transport water from the Sierras to Southern California and the Bay Area consume around 2% of the state's total, so encouraging newcomers to move to where the water flows naturally is a good idea - especially since it will also discourage the agriculture of thirsty crops
  • Internet data centers in California also consume around 2% of the state's total, of which about half is A/C load. Emerging liquid cooling technology for servers and mass storage units should help bring that down.

Of course, all of the conservation measures described above relate to stationary devices. Small mobile devices like cell phones and laptops, even bicycles, can easily be powered using grid electricity stored in batteries. The same is not true of large vehicles - the high cost, limited range and safety aspects of large battery banks are the reasons why virtually all cars and trucks on the market use internal combustion engines that rely on oil distillates. Commercial airliners rely on kerosene-guzzling jet engines, though when they are fully booked, the newest long-distance aircraft do consume less per passenger-mile than single-occupant cars do on the highway. By contrast, short-hop flights are among the least energy-efficient modes of transportation. That means aggressive conservation and/or switching to electricity is especially important for the transportation sector.

While some bus systems have been electrified using overhead catenaries, it is far more typical of rail transit: streetcars, light rail and subways. In the US, regular heavy rail has been electrified in the NEC but virtually nowhere else. The California bullet train system will be electrified, if only because it's the only way to achieve 220mph. At full capacity, the fully built out network is epxected to require around 480MW of electrical power, roughly 1% of the total installed generating capacity in the state today.

In keeping with the spirit of Earth Day, CHSRA wants it to run entirely on renewable electricity, something that will be easier with energy conservation in stationary applications. In this context, 100% renewable means that for each kWh consumed during a given time period (e.g. 1 year), there must be a corresponding kWh produced at a wind farm or other renewable source. In terms of global warming impact, it isn't strictly necessary that there be sufficient active renewable electricity generating capacity to power all of the trains at any given instant. This arbitrage is exactly where President Obama's smart grid concept comes in, something German scientists have already been working on for a while. For political reasons, that country wants to phase out both nuclear and coal-fired generating capacity.



In the context of a busy rail system, brake energy recuperation from one train to others on the same segment further improves overall energy efficiency, especially if the grid operator gets 20-30 seconds advance warning of a train braking. That information is readily available to the rail infrastructure operator, except in emergency situations.

For all these reasons, I couldn't agree more with this article in today's Des Moines Register, entitled simply:

To push clean energy, back high-speed rail

Even diesel-based "emerging HSR" is a lot more efficient than cars are at comparable occupancy rates. Considering that most cars have just one occupant, that's a low hurdle. Electrification just makes trains an even more strategic element of the passenger transportation mix going forward.

Update by Robert: This seems like a good occasion to remind folks of the CHSRA renewable energy study that we discussed last September. The report goes into detail on just what is necessary for the CHSRA to achieve 100% renewable energy for their system, a goal the Authority's board adopted last fall.

Wednesday, April 1, 2009

Avoiding Palo Alto Altogether

NOTE: We've moved! Visit us at the California High Speed Rail Blog.

While I greatly appreciate Andrew Bogan's excellent summary and comments regarding the most recent Palo Alto city council meeting, I think it's time to let the vocal minority in that town know that the state isn't going to play along with its famously drawn-out "process", in which everything gets studied until all the planners die of old age. California needs construction jobs and a new transportation artery. What it does not need is delay, so this needs to get resolved sooner rather than later.

There are alternatives. There are always alternatives, especially if you're willing to zoom out of your own back yard. I had hoped to keep the couple I've come up with under wraps to avoid distracting from plan A, but these fantasies about boring tunnels for four tracks through suburbia to preserve some supposed rustic charm are getting out of hand. In particular, Palo Alto city officials need to be disabused of the notion that they wield some kind of veto power over this state project, which is in the vanguard of a new national transportation policy.

Plan B: The Alviso Gambit

The whole tedious discussion regarding HSR through Palo Alto would of be moot if trains could stop in Redwood City, then head out to Dumbarton and use a causeway to reach Alviso (see blue line on the map below). It would be possible to thread that past two small portions of the DENWR. Perhaps US Fish & Wildlife would accept this idea if the sections nearest the boundary were enclosed to mitigate noise and other impacts on the birds. Whether environmentalists in the state and in the Bay Area would go along with that is open to question, there's the issue of methyl mercury levels in the bay mud to consider.

The next problem is that the UPRR ROW is too narrow to accommodate two HSR tracks down to SantaClara/SJC. Besides, that railroad wouldn't sell any of it even if it were. Still, it might make sense to at least consider tearing up Lafayette Street one lane at a time to obtain two individual subway tunnels for HSR tracks. This street runs right through the Golden Triangle, but mostly next to Guadaloupe creek. Trenching should not pose as serious a flood risk as it would in the mid-peninsula, but the high water table could be an issue. Vibration and other impacts during and after construction might still present major obstacles, especially if nearby chip factories are affected.

CHSRA would have to grade separate against UPRR in Alviso, probably by flying over both its tracks and CA-237. Down in Santa Clara, the alignment would have to switch to under De La Cruz Blvd, the employee/long-term parking lots at SJC, Aviation and Coleman. That's about 7 miles, though, so there would need to be an open trench section for emergency access between the Lafayette and De La Cruz sections.

Construction cost and impacts would be high, but implementing dozens of grade separations in the mid-peninsula was never going to be a picnic, either. CHSRA is currently planning a tunnel from San Tomas Expressway to SJ Diridon to avoid CEMOF and accommodate BART's desire to run at grade under I-880. The causeway alternative would get trains as far as the HP Pavilion, emerging east of the UPRR tracks just north of Diridon Station. If HSR can manage to stay on that side through south San Jose, there would be plenty of room for HSR to get out of UPRR's hair on the way down to Gilroy.

Plan C: Out Of The Fire, Into The Frying Pan

However, if UPRR or local NIMBYs block CHSRA's path through San Jose, there would be no point in pursuing Pacheco Pass any further. A much shorter causeway-cum-tunnel (cp. Øresund bridge, but on a much smaller scale) between Dumbarton and Newark would preserve the shipping lanes and avoid permanent impacts on the DENWR. Construction impacts would be significant, though, especially in light of the creosote-soaked timbers of the old rail bridge, which would almost certainly have to be removed. A tunnel-only concept from Dumbarton to Newark would also be possible, that decision should be made on the basis of cost alone.

Cargill Salt would have to be persuaded/forced to permit the construction of a low aerial structure above its still-active ponds, rising only to pass over the UPRR line. This viaduct would skirt the DENWR boundary, possibly with another enclosure section. Tracks would dive under I-880 to connect to another tunnel under CA-262, a short but busy city street in south Fremont that connects to I-680 on the other end. Residents there are no more likely to welcome construction with open arms than those in Palo Alto. However, in this case the tracks would stay in a tunnel to cross over to Calaveras Road. The active Calaveras fault would have to be crossed deep underground, which ought to give pause.

In Haynes Gulch, the tracks would run essentially at grade up to the I-680/CA-84 interchange and across via yet another tunnel to an intermodal station with the BART extension to Livermore at El Charro Road, bypassing Pleasanton to shave some time off the trip. There are some ponds at that location, not sure what they are used for - could be a problem. Burrowing under Livermore municipal airport, which is only used for general aviation, the alignment would then essentially follow the I-580 median to the Central Valley. The HSR tracks could cross UPRR/ACE, the ponds and the BART extension on an aerial, but only if the airport is turned into a parking lot.

An intermodal with BART in Fremont Warm Springs would be challenging to construct and require BART to move its station some 4000ft (~1km) south. A spur down to San Jose via the I-880 median would be possible, but that would make building ridership harder as any given train would only have a fraction of the catchment area to draw passengers from. There would be fierce opposition from San Jose, the entire Gilroy catchment area and CHSRA to any plan that would fork the starter line in the East Bay.

Any future spur up to Oakland would be substantially harder, since Caltrans will almost certainly want to retain the median north of CA-92 (San Mateo Bridge). That means cutting across to the unused ROW just west of the BART tracks at Industrial Pkwy in Union City. Light commuter rail traffic could probably squeak by there with the existing single-track ROW, but HSR would require some eminent domain against businesses. Fortunately for them, a spur up to Oakland isn't likely to happen this side of 2030.

Perhaps the biggest issue is that of SF-LA express line haul time, which AB3034 limits to 2h42m. While Altamont-via-Dumbarton is shorter than Altamont-via-SantaClara/SJC, it would nevertheless add a few minutes that have to be clawed back somewhere else. Worst case, the whole Tehachapis vs. Grapevine question would have to re-opened just to achieve the time target. That in turn would make it harder to connect Las Vegas to the network. On the plus side, service between SF and Sacramento would be time-competitive with driving, even more so for SJ-Sacramento. If CHSRA is forced to partner with BNSF in Merced and Stanislaus counties and there is an HSR station at Castle Airport (instead of Merced town) on the starter line, its catchment area would extend well beyond the Central Valley into the Bay Area, serving as a relief/complementary airport for OAK and SJC.


View Larger Map

NOTE: black lines indicate the relevant DENWR boundaries.

Consequences

Either approach would pretty much nix Dumbarton commuter rail because FRA has strict rules regarding FRA-compliant and non-compliant equipment to share track, but that's probably a survivable loss. Much more painful would be having to do a significant portion of the Bay Area to Central Valley Program EIR/EIS yet again just because Palo Alto couldn't be bothered to throw a spanner in the works at the appropriate time - basically, any time before the November election. Each year added to the schedule for planning reasons adds around 6% to estimated project cost, i.e. around $2.5 billion because of knock-on effects on phase II. That's on top of actual escalations due to more involved construction techniques. And make no mistake, dear Palo Alto NIMBYs: whatever the personal miscommunications of Messrs. Kopp and Diridon may have been, it will be you the rest of the state will blame for the resulting cost escalation if plan A falters on your account at this late juncture.

Consider for example Lodi, a small town out in the Central Valley that managed to secure a bypass for itself without a whole lot of fuss because it spoke up clearly and early. LA county persuaded CHSRA to run the route past Palmdale instead of across the Grapevine because it acted early. You had 12 years to get involved but instead - to be blunt - your elected officials chose to sit on their collective duff until just a few weeks ago. There's a time to raise a red flag and a time to accept the consequences of failing to do so. Now, it's perfectly reasonable to ask for a couple of alternatives to be priced out if the initial concept is flawed. However, it's not acceptable to expect the rest of the state and nation to pay through the nose to increase your property values while the tent cities in places like Fresno are growing larger by the day. If you want something over-and-above the norm, you're going to have to figure out a way to avoid breaking CHSRA's time and dollar budget in the process.

Note that if plan A falls through, all of the mid-peninsula cities between Redwood City and San Jose would have to fund any new grade separations of the Caltrain ROW themselves if and when commuter rail traffic reaches the high levels Caltrain is forecasting in its 2025 plan. They'd also need to pay for electrification and other improvements south of Redwood City themselves. As for the Transbay Terminal, there may not be any money left over for any HSR contributions to the DTX tunnel and the train box in phase I if CHSRA needs to switch to plan B, let alone plan C.

Conclusion

Let's hope cooler heads prevail and Palo Alto doesn't become the state's new poster child for NIMBYism, after a clear majority of its residents endorsed prop 1A. As soon as CHSRA gets its funding, HNTB needs to get cracking on affordable and acceptable solutions for sticking with the Caltrain ROW all the way to San Jose. Meanwhile, CHSRA needs to secure a ROW down to Gilroy, which means talking turkey with UPRR. Alternatives do exist, but each would create as many problems as it solves.

Sunday, March 29, 2009

Hooray For Victorville!?

NOTE: We've moved! Visit us at the California High Speed Rail Blog.

Remember that whole Las-Vegas-to-Disneyland maglev concept that Sen. Harry Reid (D-Nev) is still pushing because it's supposedly "more Vegas"? While he's been making waves in Congress, private investors have quietly pursued an alternative based modern non-compliant multiple unit trains trains running on dedicated tracks. Diesel-electric option would run at a top speed of 125mph, whereas an electrified version could run at 150mph (top speed is currently limited by the lack of FRA rules, not the available technology). Note the faint overhead catenary in the above picture, with nary a pole in sight. Or a second track, for that matter, but perhaps that is only needed at one or more points along the route.

The big idea is to relieve congestion on I-15 and at McCarran airport in Las Vegas so folks in Southern California have an easier time getting to Las Vegas. The investors had become disillusioned with prospects for public funding for a fast a rail link. The hardest part is securing a viable ROW through Cajon Pass, which is heavily used by rail freight and includes a crossing of the San Andreas fault. Therefore, the current plan simply calls for the line to terminate at a giant new parking lot northeast of Victorville. Southern Californians would drive there, park and take the train the rest of the way.

This then is DesertXPress. FRA has announced the closing date for public comments on the draft EIR/EIS: May 22, 2009. Before then, there will be three more public hearings on the project.

  1. Las Vegas Area
    Tuesday, April 28, 2009
    5:30 – 8:00 p.m.
    Hampton Inn Tropicana
    4975 Dean Martin Drive
    Las Vegas, NV 89118

  2. Barstow Area
    Wednesday, April 29 2009
    5:30 – 8:00 p.m.
    Ramada Inn
    1511 East Main Street
    Barstow, CA 92311

  3. Victorville Area
    Thursday, April 30 2009
    5:30 – 8:00 p.m.
    Green Tree Golf Course
    14144 Green Tree Boulevard
    Victorville, CA 92395

From the California point of view, there are a number of pluses and minuses here:

  • PLUS: private companies are funding an HSR line (standard gauge steel wheels)
  • PLUS: final nail in maglev coffin (at least on the California side)
  • PLUS: congestion on I-15 should ease quite a bit
  • PLUS: diesel trains require far less fuel than cars at the same occupancy rate
  • NEUTRAL: SoCal-Las Vegas not part of federally designated California HSR corridor
  • NEUTRAL: no stop in Barstow (limited water to support population growth)
  • MINUS: project not integrated with California HSR
  • MINUS: project not integrated with Pres. Obama's smart electrical grid
  • MINUS: tracks (and OCS, if any) not designed for operation at 220mph
  • MINUS: max. gradient 4.5% (vs. 3.5% for California system)
  • MINUS: only limited relief for McCurran airport in Las Vegas
  • MINUS: requires people to drive out to Victorville and park there

IMHO, there would be a lot of value in getting SoCal-Las Vegas included in the officially designated national HSR corridor for California as soon as possible. Sure, the Republicans would have a field day (for a day) but it's still the smartest thing to do.

First, it would establish that HSR out to Las Vegas shouldn't be a completely separate project, even if the tracks won't join up right away. That would give USDOT (i.e. Ray LaHood) some leverage to force integrated planning.

Second, the designation would make the tracks through the desert eligible for federal HSR dollars, which could fund the wider curves and tighter geometry tolerances required for future operation at 220mph. The DesertXPress sidesteps the thorny issue of the endangered Desert Tortoise by hewing close to I-15 east of Barstow. Nevertheless, some opposition from at least Indian gambling interests in California is likely, though siting the western terminus at Victorville makes the train less of a competitive threat.

Third, early electrification of the line would make a whole lot of sense if phase 2 of the project included a nearby HVDC power line to carry renewable electricity from the Mojave desert and Nevada to population centers in (Southern) California. But please, don't put a big solar farm and a relief airport next to one another.

Fourth, an early connection to the California network would do more to relieve McCarran airport, since 30% of its flights are to or from California cities that will be served by California HSR. At peak times, e.g. during major conventions, Las Vegas could leverage Palmdale as a relief airport, provided LAWA doesn't hobble it with a solar thermal plant right next to the runways. At 200mph cruise speed, travel time would be just over an hour. Fully leveraging California HSR and Palmdale airport would eliminate the need for a new Ivanpah Valley relief airport between Primm and Jean in Nevada, not far from the BrightSource's Ivanpah solar thermal power plant on the California side.

Sixth, project integration would permit both sides to pool both political clout in Congress and purchasing power.

The tricky part is figuring out how to integrate the projects. A spur off the SF-LA-Anaheim starter line at Mojave would make a lot of sense, but DesertXPress may not be interested in going anywhere but Victorville. A connector from there to the phase II spur between LA and San Diego is theoretically possible and would give San Bernardino an HSR station. We'll see.

Early electrification of the DesertXPress line would be excellent but it's something their web site has not previously mentioned. Note that CHSRA is currently planning its own, electrified test track in the Central Valley (part 1, part 2), which will become part of the starter line and spur to Sacramento.


View Larger Map