East Bay Blues

NOTE: We've moved! Visit us at the California High Speed Rail Blog.

No, that's not Bob Dylan on the left, but it might as well be. Of all the major population centers in California, the eastern portion of the San Francisco Bay - Alameda and Contra Costa counties - arguably drew the shortest lot. True, East Bay residents will be closer to HSR stations on the starter line than anyone in San Diego or Sacramento, but there are currently no firm plans for an HSR station in either Oakland or Union City - ever.

Moreover, the new Transbay Terminal in San Francisco will be ~1/3 mile from the nearest BART station, Embarcadero, which gets overcrowded during rush hour. TJPA's plans for a pedestrian passage under Fremont Street are still "optional" at this point and, BART has made no commitment to use any of its $241 million share of the prop 1A bonds for additional side platforms at Embarcadero plus ramps featuring moving walkways connecting to such a passage. Unless that changes, BART passengers would have to hoof it across SF city streets to the HSR station, in any kind of weather, with baggage and perhaps children in tow. AC Transit will operate buses into the building, but its unclear how many HSR passengers will take advantage of that option.

Millbrae will hopefully offer a more convenient transfer, but BART takes it's sweet time getting out to there. Worse, on any given day of the week, only one line runs out to Millbrae, so many HSR passengers will have to transfer twice. Either way, the time lost just getting to and from the nearest HSR station will mean Oakland Airport will continue to offer flights to Southern California for many years to come.

HST/Commuter Overlay

Recently, CHSRA did award a $70 million contract to AECOM, for project-level EIR/EIS work on the awkwardly named "HST/commuter overlay" that is "under consideration" (see the pink bit here). The overlay concept was introduced toward the end of the whole Altamont vs. Pacheco debate as a punt ahead of the November election. The idea is to recycle the work done on the Altamont options studied for HSR into an ill-defined regional adjunct to the core HSR network. The overlay would link Stockton and Modesto to Oakland and San Jose via Tracy, Pleasanton and Union City. There is, however, no money at all for building this overlay in either phase I (starter line) or phase II (spurs to San Diego, Sacramento and Irvine).

Moreover, the originally selected route between Pleasanton and San Jose would have trains emerging from a curved tunnel in Niles and then proceeding south via the UPRR and WPML rights of way, CA-262 and the I-880 median. Now that Santa Clara county voters have voted to add another 1/8th of a percent to their sales tax to actually bring BART to San Jose, the short but vital WPML section is no longer available. Co-operation from UPRR was always an iffy proposition anyhow, especially in Fremont. Note that Parsons Brinkerhoff are the lead consultants on both HSR and the BART extension to SantaClara/SJC. That obvious conflict of interest alone ought to speak volumes about how major transit infrastructure projects are run in Northern California.

Realistically, nothing will come of the overlay concept anytime soon. And by soon, I mean before 2030. The only exception would be if CHSRA were unable to obtain a ROW out of San Jose and down to Gilroy, e.g. because of environmental justice issues or opposition from UPRR in principle. Some observers have characterized that railroad's stance as a negotiating ploy and that may yet turn out to be true: as a for-profit enterprise, money talks even for UPRR. On the other hand, it is a long-standing, profitable enterprise that just might walk away even from a juicy deal if it thinks it could be detrimental to its core business. Time will tell.

Existing East Bay Passenger Rail Services

Meanwhile, there are already several passenger rail services in the East Bay, in addition to BART. First, there's Amtrak Capitol Corridor, which is operated by Amtrak but managed by BART (h/t to anon @ 12:50pm). It connects San Jose to Oakland to Sacramento and Auburn. The core segment between Oakland Jack London Square is served by 16 trains each way on weekdays and 11 on weekends/holidays. San Jose is served by 7 trains.

Second, there are the four daily Amtrak San Joaquins (each way) between Oakland Jack London Square (OKJ) and Bakersfield. There are also two daily Amtrak long-distance trains serving the area: the Coast Starlight between Seattle and LA and the California Zephyr from Chicago to Emeryville, with a bus connection to San Francisco.

Third, there is the Altamont Commuter Express between Stockton and San Jose, also offering four trains each way but only on weekdays.

However, this isn't quite the transit smorgasbord it may seem to some: Amtrak Capitol Corridor only connects to BART at the OaklandColiseum/OAK and Richmond stations. San Joaquins connect only at Richmond and the other standard gauge services don't connect at all. With some track work, the San Joaquins could have an intermodal station with BART in North Concord now that the Navy has returned the inland portion of the old Naval Weapons Station to the city. However, planners there appear to see no value in an intermodal station and appear to have settled on a TOD concept served by BART alone. That means the questionable eBART project to extend service to Antioch - using new DMU equipment rather than regular BART rolling stock - remains alive and kicking.

Amtrak via new Nelson Mandela Station

In particular, the OKJ station is served by a grand total of just two AC Transit bus lines, with a few more stopping 1/4 mile further west. For a city of 400,000 that is also at the geographic heart of the BART system, OKJ isn't an effective Central Station for standard gauge rail. Unfortunately, running tracks right into downtown (near 12th/Broadway) would require many miles of expensive tunneling.

Fortunately, there may be a more affordable compromise: a shortcut between Emeryville and Jack London Square via Nelson Mandela Parkway. That is a city street, so the alignment would have to run in a mostly covered trench. It has also been lovingly landscaped, something that might have to be re-done at the end of construction. The prize, however, may well be worth it: an intermodal station with West Oakland BART, just one stop from downtown Oakland and downtown SF. In addition better connections into Oakland, the point of the exercise would be to reduce line haul time between SFO, downtown SF, Sacramento and Truckee (in Winter), thus relieving pressure on I-80.


View Larger Map

While not exactly a Central Station in the traditional sense, the West Oakland location could act as a regional transfer hub. The station is currently served by three AC Transit bus lines, more could conceivably be added. There are also plenty of empty lots in the area that could support parking or taxi service if there is demand.

The biggest obstacle to construction, other than funding, would be the UPRR yard next to I-880 and 3rd Street. Passenger trains are not permitted in freight rail yards, so the alignment would have to skirt the terrain while rising back up to grade level. A couple of industrial businesses, one of which looks like a cardboard recycling center, might be affected by eminent domain as a result. Note the single track connector hugging I-880: it would only be used by southbound trains that need to return to Emeryville. There is not enough room for a dual-track loop, nor is one needed. Note that a new "Nelson Mandela" station might prompt Amtrak to reduce service to Jack London Square.

Amtrak CC: WiFi on Board

Like Caltrain before it, Amtrak Capitol Corridor recently conducted a WiFi on Board trial based on terrestrial WiMAX connections to the fixed infrastructure. The service proved much more popular than Amtrak California had bargained for. Nevertheless, the plan is to upgrade bandwidth capacity and still offer it at no charge - something that would be easy enough to do: just print a one-time password good for 2 hours on the ticket. The rationale is evidently that courtesy internet access will help boost seat capacity utilization. Stay tuned.

ACE via Union City BART

Further south, there is scope for an intermodal station with BART in Union City. There is a little-used single-track freight spur running from Industrial Parkway to Niles via Van Euw Common, right alongside the elevated BART tracks. SMCTA had already identified this possibility in the context of plans for limited commuter service across the 100-year old Dumbarton rail bridge, but this has been postponed by the suspicious 1998 fire that destroyed the western trestle and, by the need to repay a $145 million loan from the BART extension to Fremont Warm Springs that San Mateo county had to take out to pay for cost overruns related to the extension to Millbrae/SFO. Some $54 million is still outstanding, the project time line keeps slipping.

However, one opportunity appears to have been overlooked in this context: with some additional track work and trackage rights, the existing ACE service could in theory make a detour via this anyhow planned intermodal station with BART in Union City, cut over to Union Landing (I-880/Whipple Rd) and back down to Newark, as shown in green on on the map below. In addition to the BART intermodal, there would be two new stations to improve transit options for the army of Silicon Valley worker bees that sleeps in the East Bay. Like the Amtrak Capitol Corridor trains, this modified ACE route would still include a stop at Great America in the heart of the "Golden Triangle" bordered by CA-237, I-880 and US-101. BART does not and will not reach that destination.


View Larger Map

ACE to SF via Niles Canyon north slope

Shown in red on the map is the option of a new ACE service direct to additional Silicon Valley employers, Millbrae/SFO and SF 4th & King. In addition to a little bit of access track work north of Sunol and in San Jose, this would involve trackage rights from UPRR or NCRY (whichever now owns the old SP ROW along the north slope of Niles Canyon) plus trackage rights from UPRR along the Milpitas line. At the wye in San Jose, trains would head north up to San Francisco via the Caltrain ROW, in baby bullet mode. That would require trackage rights from PCJPB plus permission from UPRR, which still owns the rights to intercity passenger service on the SF peninsula. One option would be for ACE to accept Caltrain tickets on the peninsula and deduct their value from the trackage fees.

The Milpitas Line is little-used south of 101 but represents a valuable back-up route in case the Alviso line through the salt marshes ever becomes unavailable, e.g. because of an earthquake. However, any passenger rail service on this line south of 101 should implement FRA quiet zone regulations first. Of course, if and when the Dumbarton rail bridge re-opens, there could be scope for further improvements to ACE.

The bigger issues may be in Pleasanton, Livermore and especially, in Altamont Pass itself. Single tracking and slow freight trains mean ACE is at the mercy of UPRR as it tries to stick to its schedule, though it has earned high marks for punctuality recently. That said, the service does take 2h10m to cover 86 miles - not exactly a high speed train.