Showing posts with label downtown. Show all posts
Showing posts with label downtown. Show all posts

Saturday, November 21, 2009

CA4HSR Submits LA-SD Scoping Comments

NOTE: We've moved! Visit us at the California High Speed Rail Blog.

Yesterday was the deadline to submit scoping comments to the California High Speed Rail Authority for the Los Angeles to San Diego project segment. Californians For High Speed Rail submitted the following comments to the CHSRA regarding the route and station choices. You can read the whole document here, and below I excerpt the main elements.

CA4HSR - Los Angeles to San Diego Scoping Comments

Note that the first part of the comment letter are planning guidelines that emphasize station locations should be considered with respect to walkability of surrounding area, opportunities for transit-oriented development (TOD), and easy connectivity to existing and planned mass transit. These principles guided the comments on stations and alignments.

Inland Empire

  • All corridors from LA to Riverside County should be studied, except Metrolink corridor from LAUS to Ontario Airport. City of Industry station should be considered for elimination - not a good site for TOD nor is it easily walkable for residents. Locate Ontario Airport HSR station adjacent to air terminal.


  • Continue to study stations in downtown San Bernardino (Santa Fe Depot) and downtown Riverside, due to surrounding population, TOD opportunities, transit connectivity.


  • Do not further study I-15 alignment/Corona Station due to lack of large urban centers, higher population along I-215 alignment. Do not further study March AFB station due to lack of walkable, dense, TOD opportunities.


San Diego

  • Study both Escondido options (city center and I-15). For I-15 alignment, however, move transit center and Sprinter station to I-15 adjacent location and promote TOD around it.


  • Do not further study or include station in University City along existing Rose Canyon rails. Consider University Towne Center station, and consider a bored tunnel under it to bypass Rose Canyon. However, also consider eliminating this station due to 24 station limit.


  • Consider new alignments to bring HSR from I-15 to I-5 corridor, including SR-56, SR-163 to SR-52, and SR-163 to I-8.


  • Qualcomm Stadium should only be studied if it is part of an alignment to downtown San Diego (Santa Fe Depot), significant TOD at Qualcomm Stadium, and elimination of possibility of sending trains to Tijuana via I-805. This would basically be another route to downtown, and downtown SD is the key in these comments.


  • Opposes ending HSR at airport terminal. Instead proposes "dual stations" - one at airport and one downtown (Santa Fe Depot); or just downtown SD without an airport stop.

Sunday, November 15, 2009

Sunday Open Thread - From San Diego

NOTE: We've moved! Visit us at the California High Speed Rail Blog.

Sorry for the lack of a post yesterday - been busy all day with the California Democratic Party's Executive Board Meeting here in sunny, beautiful San Diego. Some news from the southwestern corner of the nation:

  • I had the chance to interview Janice Hahn, LA City Council member and candidate for Lieutenant Governor in 2010. We'll have the video up on a Calitics soon. One thing I asked her about was high speed rail - she's shown strong support for HSR recently, and I asked her if she'd be willing to be a statewide advocate for HSR should she be elected, since we seem to lack such an advocate right now. "Absolutely," she said, and proceeded to make a strong case for why California needs HSR.


  • Daniel Krause and I took a quick scoping tour of the proposed HSR route in San Diego, from the Santa Fe Depot north to Rose Canyon and University Towne Center. It seemed clear to us that a downtown station would be the best location for an SD station. Downtown San Diego has become a major regional destination, has a lot of density, and is well-served by the existing mass transit (San Diego Trolley). An airport station, which has a lot of local momentum, would be much less effective from the perspective of potential riders and certainly from the perspective of linking HSR to urban densification (which downtown SD has accomplished quite well). We also took a look at Rose Canyon, where CHSRA proposes an at-grade implementation. BNSF still uses this route for freight service, so track-sharing is an issue. Adding new tracks would mean encroachment on Rose Creek, which is what worries locals. Finally, we drove up to University Towne Center mall, which is an awful TOD location and doesn't seem like a good place for an HSR station. A possible alternative to Rose Canyon is possible though via a tunnel under UTC, along Nobel, and then south along I-5.


  • Scoping comments for the LA-SD route are due Friday, November 20th. From Dan Krause:

    It appears that most folks making comments support a downtown San Diego station. Unfortunately, the political momentum in the San Diego area is to eliminate the downtown station in favor of an airport station. While I think there is merit considering a scenario where there would be both a downtown and airport station, it is absolutely necessary for the downtown station to happen for a successful project segment.

    Comments are due for the scoping for the LA-SD section of the project-level eir-eis on Friday November 20th. Please consider sending a note to the following address and let them know a downtown San Diego needs to be preserved.

    Mr. Dan Leavitt, Deputy Director
    California High Speed Rail Authority
    Attn: Los Angeles to San Diego via the Inland Empire Section EIR/EIS
    925 L Street, Suite 1425
    Sacramento, CA 95814
    comments@hsr.ca.gov


Feel free to use this as an open thread for anything HSR-related, whether it involves San Diego or not.

Sunday, May 10, 2009

What a Difference 10+ Years Make: Arizona Solar Bullet (UPDATED)

NOTE: We've moved! Visit us at the California High Speed Rail Blog.

NOTE: The Blogger service will go offline for approx. 10 minutes at 2:00AM on Monday, May 11 for scheduled maintenance. We apologize for any inconvenience.



by Rafael

On Friday, the business section of the Arizona Daily Star published an article on a high-speed solar train, proposed as Tucson-Phoenix connection by Solar Bullet LLC, a two-man outfit in Tucson that doesn't appear to have a website with this single-page web site (h/t to Adirondacker). Neither the proposed route nor any description of the ROW issues/environmental impacts to be addressed are provided. The picture shows a three-car train, which implies frequent but expensive service. The catenaries lack support structures, but at least this image shows the tracks at grade. The author appears more focused on using photovoltaics to power the train that it is on the train itself.

Judging by the comments, this idea has been floated before but somehow never died. This is remarkable/suspicious given that the estimated price tag for the first segment of approx. 115 miles is a whopping $27 billion!

The solar panels above the tracks would not come cheap, especially given their proximity to the overhead wires and exposure to aerodynamic forces plus vibration every time a train runs past. However, the artist's rendering also shows an aerial structure with a wide gravel bed at grade. It's possible the artists was clueless, cp. the short length of the train, but a picture does say more than 1000 words. There are few major roads between the metro areas, so why not use the gravel as ballast and switch to aerial alignments only within the relatively populated regions.

Proponents are touting quad tracks so express trains can operate at 220mph, which requires 25kV AC. Note that the artist's rendering is plain mendacious in that it shows just a single track. No speed was given for the local trains, but with just six intermediate stations 150mph peak should be entirely feasible. Apparently, no-one considered if overall train frequency would justify even sidings at the intermediate stations, never mind dedicated super-express tracks.

Back in 2000, the Tucson metro area has 843,746, while Phoenix counted 3,251,786. The metro area added around one million residents before the real estate bubble burst and is now in modest decline.

The problem for any HSR project is that both cities have little or no connecting public transit. The sprawling metropolis of Phoenix has a grand total of one light rail line and has to resort to an artificial Copper Square umbrella brand for a $3 billion development effort aimed at creating a mixed use neighborhood that is intended to give the city a recognizable downtown area.

Downtown Tucson is also a branding effort rather than the result of decades of planning designed to create a shaded, walkable urban core. Tellingly, the site provides not a map of downtown but of its parking amenities, including numerous multi-story car parks where commercial or residential real estate could have been if public transport had been a priority. It was only in 2006 that residents decided to tax themselves to get streetcar service. Senator McCain's principled stance against earmarks may be laudable, but in times like these, it could also prove a liability: his fourth term is up in 2010.

HSR between Tucson and Phoenix could perhaps make sense, but perhaps only as a dual-track rapid rail proposition with tracks mostly at grade and in combination with projects to expand local light rail and/or BRT routes, all at a far lower capital investment than is being touted. I'm not sure if it's the dry desert heat, but there are actually other projects that are partially disconnected from reality. For example, DesertXPress will apparently use a near-invisible overhead wire that needs neither catenaries nor poles. The roof panels above an air-conditioned 21-mile bike path in Qatar are held up by a tangle of pipes carrying expensively refrigerated cold water, presumably to keep cyclists from suffering heat stroke. Note that the artist for this project also forgot support columns.

While I'm all for greener forms of transportation, especially electric trains and (electric) bikes, the Arizona Solar Bullet project in particular does the cause of getting HSR off the ground in the US no favors at all. In spite of criticism of the way certain CHSRA board members and staff have led the California HSR project in recent weeks and months, it is undeniable that the 10+ years spent on environmental and technical studies was not wasted. Not only do none of its renderings defy the laws of physics, the per-mile construction cost forecasts in e.g. the Central Valley are also an order of magnitude lower than the $237 million advanced by Solar Bullet LLC for the Arizona corridor. Indeed, the average for the entire 450 mile starter line from SF to LA and Anaheim, including several expensive mountain and fault crossings plus busy rail traffic at either end, is currently estimated at $73.3 million per mile.

There are good reasons why Secr. of Transportation Ray LaHood thinks California is far ahead of every other HSR project in the country, perhaps even including the still-stalled effort in Florida. Plus, CHSRA has decided it wants the high-speed network in California to run exclusively on renewable power, i.e. a reliable combination of wind, solar and geothermal, possibly assisted by hydro and biogas. However, the Authority has wisely left the implementation details to the experts in the utility sector.