Showing posts with label Monterey. Show all posts
Showing posts with label Monterey. Show all posts

Thursday, May 14, 2009

Thursday Open Thread

NOTE: We've moved! Visit us at the California High Speed Rail Blog.

Busy day here, and my train-related thoughts are currently occupied with a meeting this evening at Monterey City Hall on the debate between building light rail or bus rapid transit along the Monterey Branch Line from Castroville to Monterey. I'll be speaking in favor of a light rail solution, as that's likely to generate more riders and more transit-oriented development, but we'll see what the rest of the community's reaction is. The ROW is already publicly-owned. I'd like to think my city isn't populated by the same kind of NIMBYs we've seen on the Peninsula, but we'll see.

Not much happening around the HSR-sphere today. There has been an interesting discussion about the mid-Peninsula station in the comments to the previous post.

Arnold Schwarzenegger is busy trying to scare voters into backing his May 19th budget ballot propositions. Whether they pass or fail the state is still facing a multi-billion dollar budget shortfall, which may generate pressure to cut the CHSRA's budget, and will make it more difficult to sell the Prop 1A bonds. Democrats are busy lobbying Congress to pass legislation allowing the federal government to back California's short-term cashflow borrowing, which would greatly help matters.

Thursday, April 30, 2009

HiSpeed Services and Branding

NOTE: We've moved! Visit us at the California High Speed Rail Blog.

by Rafael

Conventional wisdom has it that HSR in California equals long-distance trains from Northern to Southern California. However, just because trains can cross mountains doesn't mean that passengers will always want to. More often than not, their origin and destination will lie in the same region, i.e. Bay Area, Central Valley or Southern California. Over time, HSR may change that, but it would be prudent to study service models that accommodate a combination of intra-regional and inter-regional trains on the same timetable.

Keep in mind that CHSRA is not a railroad, it is only responsible for planning and constructing the HSR infrastructure. That will be owned by a separate, yet-to-be-created entity in which the various investors, including the state of California, will have equity stakes. This entity will also fund any extensions. If European trends are any indication, a long-term (e.g. 20 year) contract for day-to-day operations and maintenance of the infrastructure will be awarded via open tender. Train operations governed by a timetable defined by the infrastructure operator may or may not be delivered by separate companies that bid for slots at regular auctions, e.g. every 4 years. Note that CHSRA has yet to announce the gory details of all this, so the above is just my personal educated guess.

NS HiSpeed

A useful example from overseas is NS HiSpeed, a relatively new joint venture between the Dutch national railways (NS, 90%) and KLM (10%). On the one hand, this is an umbrella brand and online portal for all high speed trains to and from destinations in Holland, including those that cross borders. On the other, in terms of passenger volume, the most important segments of the HiSpeed network will likely be Amsterdam-Schiphol Airport-the Hague-Rotterdam-Breda, to be served by AnsaldoBreda V250 trainsets.

In part because of teething troubles with ETCS level 2, this Italian manufacturer is late in delivering the equipment to NS HiSpeed and SNCB, the Belgian national railways who will deploy them on the Brussels-Antwerp-Rotterdam-Amsterdam route. In addition, the faster but also more expensive Thalys service featuring WiFi on board will remain operational. This somewhat confusing proliferation is a result of the planned liberalization for cross-border rail traffic in the EU in 2010.

This eye candy promo video features text in Dutch, but should be self-explanatory:



A key objective of the expensive HSL Zuid high speed line and the new NS HiSpeed services on it is to decongest the extremely busy motorways linking the dense randstad conurbation, home to about 10 million people. Most Dutch motorways have just four lanes total, though some have been widened to six.

The Dutch railways have long offered deeply discounted traintaxi service at 36 stations throughout the country, provided only that you buy the requisite coupon together with the train ticket. The service operates as a jitney, conceptually similar to airport shuttles in California but typically based on smaller vehicles. The driver selects the route ad hoc, rather than plying a fixed route (cp. dolmush in Turkey).

Caltrain HiSpeed?

The construction of dedicated HSR tracks in the SF peninsula will mean the end of Caltrain's existing "baby bullet" service. However, electrification plus an expected FRA waiver to operate lightweight non-compliant EMU equipment plus a top speed of up to 90mph means that future Caltrain locals will have the same SF-San Jose line haul time (p2) as baby bullet do today.

This is in keeping with Caltrain's traditional role as a standard-speed commuter railroad and also the only service being planned today. However, if there is sufficient demand, there is no reason why there could not be a Caltrain HiSpeed service in addition to the upgraded locals. After all, the PCJPB does own the right of way in the SF peninsula and could easily negotiate the right to run a certain number of Caltrain-branded trains on the HSR tracks there. It will be many years before long-distance trains will saturate the capacity of the new tracks, so why not use the empty slots for a new genuine bullet Caltrain service, running at top speeds of 125mph in the peninsula? CHSRA has yet to define a speed limit between San Jose and Gilroy, it could be higher in that stretch but nowhere near the 220mph expected through Pacheco Pass and in the Central Valley.

That means Caltrain could deliver a HiSpeed service using cheaper, previous-generation equipment. Note, however, that combining relatively frequent HiSpeed with long-distance express trains only works well if the headways are long enough and the HiSpeed trainsets have superior acceleration and braking performance. One option would be embedded asynchronous linear electric motors in the track infrastructure for a certain distance on either side of the stations. Aluminum plates integrated into the underbody design of the HiSpeed trainsets would be used to leverage this supplemental propulsion without adding significant axle load or drawing excessive amounts of power from the catenaries. During acceleration and recuperative braking, HiSpeed trains would then be hybrid electric/electric vehicles.

The primary purpose of any putative HiSpeed service would be to leverage the HSR tracks in the peninsula and especially, the HSR platforms at the new Transbay Terminal in SF. The downside is that there will only be five HSR station on the route: SF Transbay Terminal, Millbrae/SFO, mid-peninsula (RC, PA or MV), SJ Diridon and Gilroy.

An extension to Hollister would be relatively cheap but require San Benito county to join the PCJPB. That might well entail restricting further residential development to transit villages, ostensibly to protect agricultural acreage but really to protect residential real estate values in Silicon Valley. Given the proximity to the San Andreas fault, buildings in such transit villages would need to feature steel frames and at least 7-8 stories. Earthquakes tend to generate ground excitation at frequencies of around 1Hz, close to the typical base harmonic in bending of buildings in the 4-5 story range.

Running HSR tracks out to Monterey county would be much more expensive due to the interceding coastal mountain range. FRA and CPUC rules plus opposition from UPRR prevent non-compliant equipment from using existing track at standard speeds and stopping at existing stations.

Note that AnsaldoBreda already has a production facility in Pittsburg (Contra Costa county) and is planning to open another in Los Angeles. Siemens has a light rail assembly plant in Sacramento.

Metrolink HiSpeed?

In much the same vein, SCRRA, which operates Metrolink, owns the right of way between Palmdale and Redondo Junction plus the one between Fullerton and Irvine. Therefore, if it wanted to, it could negotiate the right to run a certain number of Metrolink-branded HiSpeed trains. The stations served in phase I would be Palmdale, Sylmar, Burbank, LA Union Station, Norwalk and Anaheim. In this case, the primary purpose would be to create a sufficiently large catchment area for Palmdale airport, including visitors to both Los Angeles and Disneyland.

CHSRA has already mentioned the possibility of local HSR service between LA Union Station and San Diego once the phase II spur is built. It's not yet clear where such a service would park its trains, given that no HSR yard appears to be planned between LAUS and Burbank. The train parking situation in San Diego is also unclear, it might make sense to run tracks all the way down to a terminus/yard in the Southland via the ROW west of I-5.

Amtrak San Joaquin HiSpeed?

A third possible HiSpeed service could be Amtrak California-branded and connect Palmdale airport, Bakersfield, Fresno and Merced in phase I, with an extension up to Sacramento in phase II. If CHSRA's arm is twisted enough to build a station in Hanford, at least some of these particular bullet trains would stop there as well. However, considering the rather small populations near the stations served and the need to run at 220mph to avoid impeding long-distance express trains between SF and LA/Anaheim, the Central Valley presents arguably the least compelling HiSpeed proposition, at least in phase I.

It might make sense if the Merced county station were at Castle Airport, directly inside a new passenger terminal (same as Palmdale) and Fresno Yosemite plus the blighted land beyond its runways were converted into a new mixed used district with excellent transit connections to the HSR station and downtown area. That, however, would be a huge step for Fresno to take and is not currently contemplated.

Moreover, given CHSRA's preference for Pacheco Pass, it might make more sense to defer any development of Castle Airport into a commercial airport to phase II. By that time, HSR will have had a chance to establish itself as a mode of travel and, both Fresno and San Jose might be ready to close their airports to accommodate population growth and eliminate runway blight. Already, e-ticketing and mobile boarding passes mean that check-in at the airport can boil down to dropping off any bags you may have. For passengers hailing from or headed to Silicon Valley, a comfortable 45 minute train trip to Castle Airport with broadband internet access may be preferable to the risk of fog-related delay and a clunky transfer at SFO.

The arrangement would hinge on making Castle Airport the only HSR station in Merced county, such that all trains to and from Sacramento would pass through it. Note that Sacramento's own airport is somewhat constrained by its location smack in the Pacific Flyway, which means it experiences a lot of bird strikes. In addition, it is nowhere near the future HSR station on top of the new STIF. Plans for a light rail line out to SMF call for 13 stops, none of which would be right at the STIF or either of the airport terminals. An HSR trip to Castle Airport would take about 40 minutes.

Thursday, November 13, 2008

To BART Or Not To BART

NOTE: We've moved! Visit us at the California High Speed Rail Blog.

That is the question posed by rafael in the post below which explores the impact of Measure B's narrow failure (based on the most recent results) on BART, Caltrain and our high speed rail project. Take it away, rafael!

***

The final tally is not in yet, but it is looking increasingly likely that measure B in Santa Clara very narrowly missed the 66.67% required to pass. It called for a 1/8th of a percent sales tax increase for 30 years that would have supplemented measure A(2000) funds for constructing a BART extension between Fremont and Santa Clara via downtown San Jose. A separate people mover to the SJC terminals is also planned. However, if measure B does fail, the county will not be eligible for $760 million in federal matching funds that it was counting on.

Check here for the latest update on the result.

Since the defeat was so narrow, city officials are now advocating limiting the scope of phase 1 to the section between Fremont and somewhere between Milpitas Capitol Ave and Alum Rock Ave. The whole purpose of the extension is to relieve chronic rush hour congestion on I-880 south of Fremont, so reaching the VTA light rail stop is a hard requirement. Ridership projections for this phase 1 are 50,000 a day, which may be wildly optimistic.

The idea is that the supplemental sales tax hike would be requested again at the next opportunity to enable phase 2, the tunnels underneath Santa Clara Street to San Jose Diridon. Ridership projections for the complete BART extension are 98,000 a day. Feel free chime in on this by leaving a comment in the San Jose Mercury News forum.

There is an alternative to extending BART all the way to Santa Clara that would be both cheaper and functionally superior -
see this map
.

Essentially, it involves extending BART to Fremont Irvington only (Paseo Padre Pkwy). There, passengers would transfer to Caltrain's new electric multiple unit (EMU) rolling stock, e.g. Siemens Desiro. Caltrain has already demonstrated their crash safety at grade crossings to FRA in an interim report on mixed traffic in the context of its Caltrain 2025 program.

Interim Report on Mixed Traffic (March 2008)

Caltrain 2025

Construction would begin by laying standard gauge tracks and 25kV AC overhead catenaries south from Fremont Irvington. With no third rail to worry about, secondary cross roads could remain grade crossings, saving hundreds of millions. FRA permits grade crossings for speeds up to 110mph, which is more than adequate in the narrow county-owned Western Pacific Milpitas Line (WPML) right of way.

The agency permits quiet zones in which warning bells and train horns need not be used, provided that specified measures (e.g. four quadrant gates) are implemented.

The tracks underneath Santa Clara Street would be constructed using the cut-and-cover method instead of the more expensive tunneling (except underneath VTA light rail tracks downtown). Road vehicles would be limited to a single lane each way near the construction site, so detours would be a fact of life for the construction period. Besides reducing cost, cut-and-cover also makes it much easier to support high capacity bi-level rolling stock that BART will never be able to use.

A pedestrian walkway would connect the north-south platforms at San Jose Diridon with the new underground east-west platform. The new line would connect to existing standard gauge tracks after emerging just north of the station, enabling service between Fremont Irvington and San Francisco without transfers.

Instead of spending $284 million on a people mover, a pedestrian overpass with elevators would permit passengers alighting at Santa Clara station to reach a shuttle bus stop at the dead end of Brokaw Road. Buses would use the private road between SJC long term parking and the terminals to avoid traffic.

So far, we have discussed two advantages of extending electrified Caltrain east rather than BART south: reduced cost thanks to grade crossings and cheaper rolling stock plus, higher capacity thanks to bi-level cars. There are, however, other advantages:

- Santa Clara county would not be required to fund any BART operations at all, ever.

- BART could focus on increasing pedestrian flow capacity in its downtown San Francisco stations.

- Partially offset the cost of the overhead catenary between Fremont Irvington and San Jose Diridon, Caltrain service south of San Jose Diridon could be canceled. Instead, diesel-powered Capitol Corridor trains would run down to Morgan Hill and Gilroy, perhaps even Hollister, at appropriate times of day. In the future, the corridor definition could theoretically be extended to Monterey, though that would require many miles of new or upgraded track. [Robert here: the Transportation Agency of Monterey County is working on implementing light rail on the Monterey Branch Line, and bringing the Caltrain to Salinas.]

- Having decided on Pacheco Pass, CHSRA is now "considering" an HST/commuter overlay through Altamont Pass. This is outside the scope of Prop 1A, which voters approved on Nov. 4. The basis for discussion is the $6 billion gold-plated HSR alignment developed early on in the project. It calls for full grade separation, extensive tunneling and an aerial structure along 7th Street to West Oakland BART. The latter feature would create the option of adding a second transbay tube to the new Transbay Terminal in San Francisco at some point in the distant future.

Between Fremont Irvington and Milpitas, this alignment relies on the aforementioned WPML. The resulting conflict with the BART extension project may well have have been a major factor in settling on Pacheco Pass for HSR. However, extending BART south of Fremont Irvington would effectively preclude any chance of ever getting anything resembling an HST/commuter overlay built.

By keeping the WPML ROW at standard gauge, Caltrain could host Capitol Corridor and ACE trains pulled by two-mode locomotives (diesel genset plus pantograph), provided that FRA permits this mixed traffic scenario. These guest operators could choose to loop back to Niles via Santa Clara/SJC, Great America and Fremont Centerville. Alternatively, they could run trains up to 4th & King in San Francisco.

To reduce the construction cost of the overlay, the old SP track on the north side of Niles Canyon could be refurbished and straightened out with one short tunnel. A second track would be laid through Pleasanton, Livermore and Tracy and shared with UPRR freight trains via mutual trackage agreements. Everything would be at grade, with quiet zones and grade crossings except where traffic volume justifies grade separation. Maximum speed would be 110 mph or less.

If desired, additional ACE trains could also serve Modesto as well as express service between Union City and Oakland/Richmond, with bus connections to the new SMART station in San Rafael. Instead of an aerial alignment to West Oakland, a covered trench down Nelson Mandela Pkwy should be considered.

-rafael

Tuesday, July 8, 2008

HSR Seizes European Short Haul Market

NOTE: We've moved! Visit us at the California High Speed Rail Blog.

So reports The Times today on how soaring fuel costs are driving passengers to high speed trains:

The airline industry has been crushed by the price of kerosene and deserted by passengers fed up with delays. After decades of disappointment, false dawns and virtually bankrupt Channel Tunnels, we have finally arrived at the age of the train and the evidence is in the crowd at St Pancras.

Only eight months after opening its doors in November, the new station is choc-a-bloc at peak hours, an exciting but slightly nerve-wracking development for Eurostar and its biggest shareholder, SNCF, the French state railway.

Traffic growth on Eurostar is accelerating like an Alstom locomotive, increasing by 21 per cent in the first quarter, compared with the same period in 2007, and revenues are up by a quarter. Those figures were no flash in the pan, a boost from all the hooplah at last year's opening of St Pancras. Traffic in the second quarter has grown at similar rates, insiders say.

While Eurostar thunders through Kent, the competing service to Paris and Brussels is lost on a never-ending building site west of London. The Terminal 5 fiasco has not helped British Airways's short-haul European business, but by next year (assuming no new operational disaster) it should have ironed out the wrinkles.

Then, BA is left with the awful question of whether short-haul air traffic has any future in Europe. The answer has to be a resounding “no”.


There are a LOT of reasons for high speed rail and we've covered all of those and then some on this blog (no really - check the archives!), including economic stimulus, the environment, declining oil supplies, and air quality. But it may be that the airline crisis is the tipping point that convinces Californians of the value of high speed trains.

For many years, even at the beginning of this year, a common reaction to the high speed rail proposal was "why would I take a train when I can take Southwest for $50?" Until this year Californians assumed that cheap air travel would always be there for them within the state.

No longer. As more and more media outlets report on the airline crisis, and as Californians make the correct link between higher fares and the higher prices they pay at the pump, they realize that cheap airfare is about to become a thing of the past. And since driving isn't an attractive replacement, owing to cost and time, high speed rail is the perfect solution for shorthaul intercity trips within our state.

I promise this isn't going to become "the airline crisis" blog. You'll continue to hear more about the full range of benefits of the HSR project. But it may be that the airline crisis is what cements in the public mind the need for high speed rail. And it should put the final nail in the coffin of the ridiculous ridership debate - as if there's any doubt about HSR's ability to attract enough riders with this knowledge in mind...

CHSRA Meeting: The Authority held its public comment meeting on the Final EIR today in San Francisco. Owing to my obligations here in Monterey I wasn't able to get to the meeting until around 3 PM, by which point it was already over. If only there were some sort of high speed train to get me to SF...oh well. As rafael told me there wasn't much new - the usual pro and con comments ahead of tomorrow's vote to accept the EIR.

The real action on HSR continues to happen at the State Capitol, where the Senate Appropriations Committee was expected to debate AB 3034 yesterday - but instead postponed that until Thursday at 10 AM. It's anybody's guess what's going to happen to the bill. We hope to have someone there for the meeting on Thursday.

Thursday, March 20, 2008

High Speed Rail: The View from Monterey

NOTE: We've moved! Visit us at the California High Speed Rail Blog.

This week's Monterey County Weekly has an excellent cover story on the high speed rail project.

It's written from the point of view of we who live in Monterey County, which is valuable because the line will never actually reach us at all. Yet there is a lot of enthusiasm surrounding the project, because we still like to visit family and friends in and take business trips to Southern California. The thought of taking a fairly short bus or train ride to Gilroy to reach the HSR station and then a 2 hour trip to LA is really enticing for us - currently we either have to take a 6 hour drive to get to LA, or drive an hour and a half to San José and fly down - at least a 4-5 hour trip when you include security and delays. This article, and support for HSR here in Monterey, shows how high speed rail will benefit the entire state, not just those specific towns along the line.

The article is a good introduction to the project and the politics surrounding it, and mentions the looming environmental fight over the Pacheco Pass alignment, and funding questions. I'll have much more to say about the Sierra Club's stance on the Pacheco alignment in a future post, but for now, go read the article, e-mail it to friends, etc.