Thursday, April 16, 2009

Obama Announces HSR Funding Plan

NOTE: We've moved! Visit us at the California High Speed Rail Blog.

Today President Barack Obama, Vice President Joe Biden and Secretary of Transportation Ray LaHood announced the DOT's high speed rail strategic plan. You can find the full details of the plan at the USDOT website.



It's an important announcement and contains some long-awaited policy changes that will help make HSR a reality across the nation. It's not yet clear how this will impact the California HSR project, but the way the funding allocation categories are set up appears to be quite favorable to us here in California.

First, I want to quote from both President Obama and VP Biden - these guys get it when it comes to HSR. It is a sea change from the last 25 years of refusal to speak openly and honestly about our nation's transportation needs.

“My high-speed rail proposal will lead to innovations that change the way we travel in America. We must start developing clean, energy-efficient transportation that will define our regions for centuries to come,” said President Obama. “A major new high-speed rail line will generate many thousands of construction jobs over several years, as well as permanent jobs for rail employees and increased economic activity in the destinations these trains serve. High-speed rail is long-overdue, and this plan lets American travelers know that they are not doomed to a future of long lines at the airports or jammed cars on the highways.”

He nailed it. This quote has it all - energy independence, job creation and long-term economic growth, and relieving congested airports and freeways. Joe Biden's quote is equally as good:

“Today, we see clearly how Recovery Act funds and the Department of Transportation are building the platform for a brighter economic future - they’re creating jobs and making life better for communities everywhere,” said Vice President Biden. “Everyone knows railways are the best way to connect communities to each other, and as a daily rail commuter for over 35 years, this announcement is near and dear to my heart. Investing in a high-speed rail system will lower our dependence on foreign oil and the bill for a tank of gas; loosen the congestion suffocating our highways and skyways; and significantly reduce the damage we do to our planet.”


I don't know who was writing their speeches, but they clearly understand the case for HSR.

That case is made strongly and powerfully in the HSR strategic plan document (PDF, 3MB). It is one of the best arguments for HSR that I've ever seen. This administration is serious about HSR. The plan includes a good overview of the history of rail funding in America, explaining that we have spent over $1 trillion on roads and airports in the last 50 years but have starved rail - even though, as the report makes clear, high speed rail is one of the best methods to move people over distances from 100 to 600 miles:




The report also recognizes the need to update the FRA's regulations to make HSR more of a possibility in this country (this should be music to Rafael's ears):

While most high-speed systems overseas have a good safety record, usually on dedicated track, U.S. railroad safety standards are designed to keep passengers and crew safe in a mixed operating environment with conventional freight equipment, which is much heavier than comparable
foreign equipment. The advent of Positive Train Control (PTC), crash energy management, and other advances provides the United States with an opportunity to revise its safety approach in a manner that accelerates the development of high-speed rail while preserving and improving upon a strong safety regime. This will be a challenge for the Federal Railroad Administration (FRA) as it seeks to administer its critical safety responsibility and facilitate high-speed rail development. The systems approach required to ensure safety of new HSR corridors will necessitate consideration of additional changes in several regulations, including equipment, system safety, and collision and derailment prevention.

The heart of the document is a three-pronged approach to funding HSR projects. I'll include the full text of the "tracks" below for folks to peruse:

1. Projects. Grants to complete individual projects eligible under Sections 301 (IPR projects) and Sections 302 (congestion projects) described above, for the benefit of existing services. Eligible projects include infrastructure, facilities and equipment. In order to qualify, these projects must: (a) be "ready to go" (i.e., environmental work required by law (National Environmental Policy Act, or NEPA) and preliminary engineering (PE) are complete), and (b) demonstrate "independent utility." For projects that meet the independent utility test but have not yet completed NEPA and PE, funding is available to conduct NEPA and PE work to make projects ready to go and, therefore, eligible under a subsequent grant solicitation. For rolling stock proposals, DOT will encourage acquisition of new, standardized, interoperable equipment
that incorporates modern safety features. Under this track, funds would be obligated for successful applications under standard grant agreement terms and conditions, including ARRA oversight and reporting procedures.

2. Corridor programs. Cooperative agreements to develop entire segments or phases of corridor programs eligible under Section 501 (HSR) and Section 301 (IPR), benefiting existing or new services. In order to qualify, these corridor programs must: (a) be based on a corridor plan that establishes service objectives and includes a prioritized list of projects to achieve those objectives; and (b) have completed sufficient corridor/ section/phase programmatic or project environmental (NEPA) documentation and sufficient planning to provide reasonable project cost and benefit estimates. For corridor programs that do not qualify under (a) and (b) above, funding is available to complete this work and make corridor programs eligible for subsequent solicitations. Under this track, funds for selected applications of a corridor program phase and/ or geographic section would be set aside at the outset, and provided at pre-specified milestone approval points. This approach would involve a higher level of Federal oversight and support than under even the
heightened scrutiny inherent in standard ARRA grant agreements.

3. Planning. Cooperative agreements for planning activities (including development of corridor plans and State Rail Plans) eligible for funding under Section 301 of PRIIA, using non-ARRA funds. This third track provides States an opportunity to prepare themselves for any funding remaining in subsequent rounds of ARRA, and/or future year appropriations. It is intended to help create the pipeline for future corridor development needed to build out a national HSR/IPR network.

As I read this, California's project is eligible for all three tracks. Of course, so would many other states. The plan also recognizes distinctions between what they call "HSR express" which is a California-style system that can achieve 150 mph or above; "HSR regional" which can achieve speeds of 110-150 mph; "Emerging HSR" where new corridors of around 90-110 mph are to be built, and "Conventional Rail" which is basically Amtrak outside the NEC. I hope that as the only true HSR express project on the drawing board (the NEC is in a somewhat different category as it already exists) that will give us a big boost, as other states fight over the rest.

So overall I think this is a huge boost for HSR, even though it does leave some things unclear as to how exactly our own project will fare. The DOT will be making the first project funding announcements later this year, for tracks 1 and 3 - track 2 will be announced toward the end of 2009 or in early 2010.

This announcement has gotten a lot of reaction around the blogosphere, but I want to single out for criticism Matthew Yglesias's take on the announcement:

My take on this is that the most promising projects on the merits, from a federal point of view, are probably those that upgrade the existing Northeast Corridor (where we know demand exists) and those that connect to the Northeast Corridor since the existing passenger rail corridor extends the utility of the new link. The Chicago Hub Network and the California Corridor concepts strikes me as very important for the long-term future of their regions, but for it to be useful will take a lot of time and money. I assume that the relevant state-level politicians for the Gulf Coast and South Central Corridors aren’t going to be interested in ponying up the sort of state funds that would make these projects competitively viable, and that may be for the best since I think those corridors may be a bit ill-conceived. It seems strange to build so much track in Texas and not manage to link Houston with Dallas.

This is a pretty flawed way to look at things. What Yglesias proposes is in fact the model Clinton eventually adopted. In 1993 he proposed a broad national HSR plan, but by the late '90s he decided to just focus on upgrading the NEC and rail was left to wither around the country.

Yglesias is wrong to say that we should prioritize the NEC and connections to the NEC. Significant improvements in speed and carrying capacity can be made in the Midwest with a few billion dollars, and the California project need federal cash infusion now to ensure completion by 2018. All of those will revolutionize rail transportation in America to a much bigger scale than upgrades to the NEC. Too much focus on the NEC is one of the primary reasons for the lack of passenger rail upgrades and improvements around the country. It's time we took HSR national.

And with President Obama's plan, that is exactly what will happen. Now, to make sure this all gets funded...

UPDATE: Rafael's comments:

Nothing particularly new here, except that USDOT will be sticking with the 11 already designated corridors (incl. the NEC). Disneyland to Las Vegas, the Texas T-bone and other hopefuls are not mentioned. So far, the President is talking about the $8 billion in the stimulus bill plus a measly $1 billion for each of the next five years. That's enough to get started, but not nearly enough to leave a legacy.

On the plus side, he mentions the need for long-term commitments from states. Presumably, that translates to a preference for those willing to put some serious skin in the game, e.g. California.

California's much more ambitious bullet train network would presumably fall into the second "track" but it's unclear if there will be anything left in the kitty at that point. Still, given the increasing amount of political capital the President is investing in HSR, it seems likely that future bills will increase the total amount available once USDOT has put in place a suitably technocratic process for evaluating grant applications on their merits. Washington being what it is, the notion that political considerations such as swing state status won't matter is probably more pious hope than realistic expectation.

In particular, additional federal funding for planning and development of additional HSR corridors will be sought in the context of the regular surface transportation bills. In plain English, that means rail proponents will have to duke it out with the highway lobby. Fortunately, the principle that transit projects will be eligible for up to 80% federal funding, putting them on par with highways, has already been established. Note that those regular bills would also be the appropriate place to make adjustments to the map of eligible corridors. The current one dates back to 2002.

In addition, FRA will need some additional funding for drawing up rules enabling mixed traffic on rapid rail routes as well as bullet train operations at speeds exceeding 150mph. The various HSR allocations do allow USDOT to retain a small fraction of the total grant volume for its own operations in support of HSR implementation.

Homeland Security Theater

NOTE: We've moved! Visit us at the California High Speed Rail Blog.

HEADS UP: More on President Obama's strategic plan for HSR this afternoon.



Remember ye olde threat level chart and the "chatter" that mysteriously reached a crescendo every time the previous administration wanted to change the subject? Ah, those were the days. Of course, nothing last longer than a temporary measure, so air travelers still have to subject themselves to ritual humiliation every time they want to board a plane. Next up: full body scanners based on terahertz lasers. And, being government employees, TSA officers will have no interest in anyone's privates. Except ...

By contrast, travel by train remains a very civilized affair from the passengers' point of view. Usually, you just board, sit down, stow your bags and show your ticket to the conductor when he/she asks for it. True, Amtrak has been conducting sporadic random searches on platforms for a year now, but that's about it. Like most railways around the world, it had previously kept its visible security measures to an absolute minimum.

The reason for the apparent lack of security at train stations is fairly simple: trains can't fall out of the sky, nor can they be made to crash into buildings. Even if he could reach the driver's cab, a would-be hijacker could not force him to go to a different destination, because the automatic train control system - if present - will force the train to stop before it can run a red light.

So, No Worries Then?

Instead, terrorist attacks based on bringing a device on board a train have tended to target crowded subways and commuter rather than long-distance trains in a perverse effort to maximize the carnage, though terrorists in Italy have in the past set bomb timers to explode while a regional train was traversing a tunnel (h/t to Devil's Advocate).

Examples include the Aun Shinrikyo sarin release on a Tokyo subway train in 1995, the Al Qaeda bombings in Madrid in 2004 and London in 2005 and the Islamic terrorist bombings in Mumbai in 2006. Chechen separatists are suspected of multiple suicide bombings on trains in Russia in recent years.

Another type of terrorist attack is directed against busy station halls, e.g. by neo-fascists (h/t to Devil's advocate) in Bologna in 1980 and ETA's foiled attempts in Spain on Christmas Eve of 2003. The venues of the Mumbai attacks of 2008 also included a train station.

The above list is not exhaustive, just intended to underline that trains and train stations have indeed been targeted by terrorists in a number of countries in the past. Recently, Spanish state airline Iberia has complained that RENFE's AVE passengers are still not subjected to the same level of scrutiny as its own, in spite of past terrorist attacks against Spanish trains by both Al Qaeda and ETA. Meanwhile, RENFE's market share on the busy Madrid-Barcelona route has increased at the airlines' expense. In other words, Iberia is complaining about the supposedly unfair competitive advantage trains still enjoy in terms of the customer experience. It's entirely possible that some US airlines will talk up security concerns once they start losing market share to HSR on medium-distance routes like SFO-LAX.

In 2007, a PhD student in Australia researched SNCF's security for the TGV system and identified weaknesses related to passenger and baggage screening. Note that Eurostar does perform passport checks and requires check-in, e.g. using an e-ticket with a bar code on it. In addition, passengers have to go through metal detectors and run their bags through x-ray scanners, just like they would at an airport. The railway has also hired outside security personnel to supplement its own staff. Premium fare passengers are asked to reserve just 10 extra minutes to pass through security, everyone else should arrive half an hour early. These procedures are a reflection of the fact that the UK is not a signatory to the Schengen convention, compounded by the strategic importance of the Channel Tunnel.

The bitter irony is that high speed rail systems are actually hardly ever the target of attacks based on devices smuggled on board. Meanwhile, security for the local commuter trains and subways that provide connecting transit for HSR remains comparatively lax - scanning every person and bag would severely constrain their capacity. While no politician or rail operator would ever dare say so, implementing the homeland security theater so selectively may actually deliver no more than marginal system-wide benefits. It may make the general public feel safer, but in reality it just shifts some risk from one type of train onto others.

You can always argue that doing something is better than doing nothing, but perhaps rigorous screening of every passenger and bag for HSR only isn't the best way to spend the limited security dollars available to rail operators. Amtrak's concept of random spot checks could deliver greater security at lower cost and inconvenience to passengers, provided it applies to anyone on any type of train operated by any company, on railroad property or loitering just outside it. In practice, that would mean replacing railway security staff with regular TSA or police officers. They would already have the legal authority to enforce checks, so attackers cannot just beg off and try again at some other time.

Infrastructure Surveillance

Some readers may consider anything less than the measures already in place at airport as inadequate. After all, back in 1983, Carlos the Jackal did plant a bomb on a TGV in France, killing three innocent people. However, afaik there haven't been any bombings on board high speed trains since, even though some now routinely carry over 1000 passengers at 300 km/h. The reality is that life is risk and, terrorism is a fact of life most people around the world are resigned to living with. They assess it in relation to other risks, e.g. accidents on the road or on the home. The US population may not have reached the same conclusion yet because it has mercifully suffered relatively few terrorist attacks to date. Sadly, there is no such thing as perfect security, nor is the price for anything approaching it worth paying.

More recent attacks against long-distance trains have tended to focus on the rail infrastructure instead, especially on the tracks, e.g. in Palo Verde, Arizona in 1995 or Russia in 2007. Some (attempted) attacks are suspected to have been perpetrated by terrorists, others by saboteurs (e.g. rogue elements during a strike), extortionists (e.g. disgruntled ex-employees) or simply vandals (e.g. misguided teenagers). In other cases, both the perpetrators and their motives remain unknown.

Again, this list is not meant to be exhaustive. Rather, my purpose is to highlight the simple fact that rail networks are huge, yet a small amount of explosives or even just some concrete slabs can be enough to derail a train. The resulting casualties can be minimized by choosing very stiff train designs with articulated frames, e.g. products from Alstom or Talgo. However, the primary objective should always be to make it as difficult as possible to trespass onto the tracks in the first place.

That means tall sturdy fences/sound walls plus video surveillance of the tracks along the entire route, plus a train control system that will force any trains approaching the site of an identified (potential) problem to perform an emergency stop. These measures make it more difficult to gain access to the tracks, easier to detect a breach of security and less likely that an attack will succeed. An important fringe benefit is that mentally confused or suicidal persons as well as livestock and wild game will all be less likely to wander onto the tracks.

In locations where HSR tracks run in close proximity to legacy tracks, these measures should be extended to them as well, perhaps with automatic gates at freight spurs. Video surveillance of the entire right of way means the HSR infrastructure operator may well be able to detect a minor derailment of a freight train before the its engineer does and take appropriate action. This capability could be enhanced by adding microphones and is worth discussing with e.g. UPRR, since they cited their trains potentially fouling an adjacent HSR track as a safety concern.

The downside is the cost of implementing and maintaining all of these measures on the entire network. Fortunately, ever-improving software is reducing both the overheads and the risk of human error through partial automation. CHSRA has already budgeted for this in the scope of the engineering work to be done for the California network (see p6):

"The line will be fenced and equipped with intrusion detection equipment that can detect persons, animals or debris entering the right-of-way and linked to a central train control center."

In addition, road overpasses will need to be fenced off. Typically, railway security operations are tied in with those of law enforcement and when appropriate, those of intelligence services as well. It's difficult to know how many lives anti-trespass and surveillance measures have already saved. What is certain is that they are almost completely transparent to passengers - which is as it should be.

Wednesday, April 15, 2009

Feedback to CHSRA

NOTE: We've moved! Visit us at the California High Speed Rail Blog.

Many thanks to all those who contributed to the post Suggestions for the CHSRA Web Site over the Easter weekend. Below is my summary of the feedback, plus some suggestions of my own. An unsolicited copy has been sent to CHSRA.


  1. The Authority should think of its web site as the primary means of detailed communication with the general public. Print, radio and TV media appearances should be used to plug the URL and increase traffic.
  2. In its current form, the site does little to support the current phase of the project, i.e. securing funding while implementing multiple simultaneous project-level EIR/EIS processes. The Authority needs to move beyond advocacy of the general idea of HSR to documentation of specific business processes.
  3. Overall project status: milestones achieved, upcoming milestones, timeline (at high level). Special focus on funding, including e.g. list of components expected to be eligible for federal stimulus funding.
  4. Count-down to start of construction and start of operations. Count-up of miles of tracks laid, funding secured and dollars spent to date.
  5. Revamp of library section: much smaller documents (= faster downloads) with embedded hyperlinks/references. Design for web, not hardcopy. Slice and dice existing PDF tomes to support project-level EIR/EIS and fundraising. Relegate versions that include discussions of options already discarded to an archive.
  6. Each project-level EIR/EIS process should have its own section on the web site. Desired resources are:

    • info on consulting firm hired for the segment
    • process status: milestones achieved, upcoming milestones, timeline (at segment level)
    • timely announcements of scoping meetings
    • explanation of project-level EIR/EIS process in general (link)
    • CHSRA's obligations regarding comments received (link)
    • options for how to comment (link unless segment-specific)
    • summary of reasons why segment is part of the preferred route
    • geographic scope of the segment
    • description of right of way ownership & easements (+ link to docs)
    • description of other rail services in or near ROW, associated constraints
    • description and scale drawings (cross-section + elevation with human figures/other structures for reference) of implementation used for cost estimation
    • summary of reasons for choosing that implementation as a starting point
    • electronic copies of comments already received during the comment period

  7. Glossary explaining technical terms like "retained fill", "embankment", "cut and fill", "aerial" etc. to the layman using drawings (cross-sections, elevations with human figure for scale reference). General discussion of pros and cons during and after construction (esp. underground options). Cost per mile for relevant precedents.
  8. Scientific sound recordings of actual HSR trains at various distances (up to 1/2 mile) and speeds (up to 200mph), for various track elevations, in open countryside vs. urban area, with and without noise mitigation etc.
  9. Addition of realistic soundscapes (incl. other sources like road traffic) to NC3D animations
  10. Reference material on/links to: grade crossing safety, hardened vs. separated grade crossings, bells & horns, diesel locomotive emissions, overhead catenary system parameters and safety, relevant noise & vibration metrics
  11. Reference material on the concepts of eminent domain, reverse condemnation. Articulation of CHSRA policy incl. stage/conditions in project-level EIR/EIS process that will prompt a decision on this.
  12. Summary of project history to date, archive of superseded documents (clearly marked as such on background of each page)
  13. Avoid the use of HTML frames and Javascript links to ensure all documents, videos etc. can be referenced via an easily obtained permanent URL. Put link to Google Map of route at top of routes page, enable references that preserve pan and zoom values.
  14. Consider using Google Sketchup for 3D sketches of possible implementations. Publish recurring model elements (tracks, trains, OCS, earthworks/concrete structures, generic houses, generic cars & trucks, generic trees, surface textures incl. climbing plants etc.)

Tuesday, April 14, 2009

Quentin Kopp On Transbay Terminal

NOTE: We've moved! Visit us at the California High Speed Rail Blog.

In response to yesterday morning's post on the Transbay Terminal Quentin Kopp, chairman of the California High Speed Rail Authority, called me up to chat about the project and to give his side of the story.

First, he said that there is no agreement yet on the Transbay Terminal capacity issue. The Steven T. Jones article in the Guardian shouldn't be taken to imply that any solutions have been reached. The notion of 8 trains an hour at TBT and 4 at 4th and King came from a meeting with MTC engineers, but again it's just a proposal. I asked Kopp what he thought the right solution should be and he said he needed to hear back from his engineers, and that might take up to 6 more months.

Second, Kopp explained from the CHSRA's perspective the debate over the Transbay Terminal solution. Two months ago engineers from the Transbay Joint Powers Agency, the Peninsula Corridor Joint Powers Board (Caltrain) and the CHSRA met to discuss the Transbay project. It was there that the engineers, without dissension, agreed that the existing design was inadequate to accommodate the 12 trains per hour that CHSRA requested.

And where did that 12 trains per hour figure come from? According to Kopp, it's based on the 2035 ridership projections in the 2008 study done by Cambridge Systematics.

Third, Kopp emphasized that the Transbay Terminal remains the CHSRA's preferred SF terminal, has been since 2006, and is of course written into Proposition 1A. Kopp does have financial concerns about the project - he quoted a cost figure of $2.8 billion. He believes that TJPA is moving too quickly on this and that CHSRA will be forced to commit some of its $9 billion HSR bond money to the project sooner than he'd prefer.

This is problematic for Kopp because of the possibility of precedent-setting. As he explained it to me, if SF gets a $2.8 billion tunnel and train station, then many other stations and cities along the route will point to that and demand that similar amounts of money be spent on their own preferred station designs and grade separation solutions. Kopp is determined to bring the project in on-time and on-budget, and doesn't want the Transbay Terminal project to suck up an undue amount of the available money at the expense of the rest of the line.

Kopp also expressed dissatisfaction with the track layout, specifically the curves of the track from 4th and King to TBT, but the above issues seem to be at the heart of his and the CHSRA's concerns.