How Exactly Will HSR Connect To Airports?

NOTE: We've moved! Visit us at the California High Speed Rail Blog.

by Rafael

One of the objectives of the California HSR project is to provide effective connections to existing airports. This should allow airlines to offer connecting train journeys for their long-distance flights. It is also supposed to make secondary airports more attractive to air travelers, but success will depend heavily on getting the last mile transfer between platforms and terminal and other details right.

CHSRA claims the chosen route will achieve this for SFO, Palmdale and Ontario airports. Lindbergh Field (SAN) could now be added to that list, but the purpose of the multimodal transit terminal there is a different one: making it convenient for those arriving by car to take the train rather than fly to other California destinations. Freeing up slots for long-distance flights by displacing short-hop shuttles is another objective for California HSR, but other cities perceive downtown stations as more effective in that context. That is part of the reason why HSR trains will be not be tightly linked to Oakland, San Jose, Fresno, Bakersfield, Burbank, LAX or Sacramento airports.

So let's focus on SFO, Palmdale and Ontario: how exactly will long-distance flights and short-to-medium-distance HSR trips be combined into an attractive value proposition for the traveler? To answer this, we need to look at the following aspects:

  1. How many long-distance flights will be offered out of each airport?

    In the aviation business, there is no formal definition of "long haul". In the US domestic market, it appears to refer to flights of at least 6 hours, e.g. coast-to-coast and transoceanic. California-Hawaii is borderline. Of course, some HSR customers will take a short train trip to connect to a much shorter flight, e.g. to the Pacific Northwest or the interior west. Unfortunately, airports don't publish their statistics down to that level of granularity - at least not free of charge.

    SFO statistics reveal the airport handles 20,000-25,000 air carrier movements a month, 2.5-3.5 million passengers, of which 550,000-850,000 are international. The airport experienced robust growth in 2008 and now ranks among the nation's top 10, though passenger numbers still have not recovered to pre-9/11 volume. Note that in 2006/7, SFO commanded much higher fare premiums for long-distance flights than e.g. LAX. About 25% of all passengers flying in or out of SFO hail from or are headed to other California destinations. Factoring in aircraft size, this probably translates to ~1/3 of all aircraft movements.

    Ontario is a much smaller airport, with just 7-8 million passengers a year. Most of the long-distance flights appear to be to domestic destinations, with just a few flights to Mexico and other Latin American countries out of the small international terminal.

    Palmdale is another of LA's "world" airports, but it recently lost its one and only commercial service (United to SFO) when the subsidy ran out. There is now talk of converting part of the huge area to a solar thermal power plant, though it's unclear if that would prevent the resumption of commercial operations once HSR puts this airport within ~30 minutes of downtown LA. Note that the combination of elevation and high summer temperatures mean that air density at PMD is lower than at LAX, so any fully laden 747s or A380s would need an extra-long runway and a gentle ascent slope to take off.

  2. How many HSR trains will be offered to these airport stations?

    In general, this is still very much up in the air. A great deal depends on how easy it will be to find attractive fares, get to the nearest HSR station and, transfer between HSR and flights at the airports. The number and ease of transfers is especially critical for passengers with more than just carry-on baggage.

    In spite of the large volume of traffic at SFO, only a subset of HSR trains serving the Bay Area will stop at Millbrae. Expect fares between downtown SF and Millbrae to be artificially elevated to avoid low seat capacity utilization on long-distance trains and cannibalization of Caltrain and BART ridership. The purpose of the station is to provide connectivity for passengers hailing from or headed to destinations well south of SFO, e.g. Silicon Valley, the Central Coast and the Central Valley. Note that CHSRA expects just 3,000 boardings/alightings per day at Millbrae.

    Ontario airport is supposed to be on the phase II extension between LA and San Diego via Riverside. HSR trips to and from LA Union Station are expected to take 25 minutes and, CHSRA expects 10,000 boardings/alightings per day. For reference, the FlyAway bus between LAUS and LAX currently takes 30-50 minutes, depending on traffic. However, a new light or heavy rail link via the Harbor Subdivision Transit Corridor could easily cut the budgeted transfer time in half.

    It's too early to say what fraction of HSR trains will stop at Ontario, except that CHSRA is planning to use LAUS as a through station, with most trains continuing on to San Diego because of track capacity constraints between Fullerton and Anaheim. San Diegans may well decide to use HSR - possibly including Amtrak Pacific Surfliner at 110mph top speed - rather than fly within California, just so more long-haul flights can be offered out of Lindbergh Field. Taking HSR to catch a plane at Ontario would be an inferior solution for them, though perhaps not for residents of the Murrieta-Escondido area.

    Palmdale will be included in phase I. In addition to passengers that would otherwise have used LAX or Burbank, there will be some from the Central Valley. Commercial services to Fresno Yosemite and Bakersfield do still exist, but they are expensive. Even so, it will take some aggressive lobbying of airlines and sweet flight/train bundle deals to build enough ridership, which CHSRA optimistically (?) estimates at 12,000 boardings/alightings per day.

    Note that IFF a spur out to Las Vegas ever does materialize, Palmdale would be roughly 75min from Sin City, possibly close enough to serve as a relief airport for McCarran during crunch periods such as major conventions. Ontario via Cajon Pass would be a little further. The bulk of the relief would come from the gradual elimination of flights to California cities on the same bullet train network, comprising almost 1/3 of aircraft movements at Las Vegas.

  3. How will customers discover plane/train combo fares?

    If it has not yet done so, CHSRA will presumably request IATA codes for all of its stations so they show up as destinations in airline flight reservations systems. Systems like SABRE are also used as the back-ends to many internet travel portals. It is far more likely that a passenger would discover an HSR trip as a connecting service for a flight than vice versa.

    At many airports around the world (e.g. Atlanta, London Heathrow, Paris CDG, Frankfurt/Main, Amsterdam, Vienna, Oslo, Copenhagen, Geneva, Cologne, Leipzig, Kansai (Osaka)), the train platforms are within easy walking distance of the airport terminals. At others, there are frequent people mover connections (e.g. Birmingham UK) to those terminals that are beyond walking distance. However, IATA appears to permit code-sharing even if the train station is many miles away. This is disingenuous as it causes the reservation system to show the plane/train combo journey as having just two legs when it's really three. Many IATA codes for train stations not co-located with airports begin with a Q, X or Z, but this is also not enforced. The use of just three letters also means the most obvious combination may already be in use for an airport somewhere else in the world.

    For a sense of how long-haul customers would book a connecting train journey, consider United's GroundLink service to most of France via Paris CDG and SNCF TGV. An enterprising airline could just as easily offer transoceanic service to e.g. Palmdale plus connecting service to any destination on the California HSR network.

    In California, it would be desirable to use SFO for the Millbrae, PMD for the Palmdale and ONT for the Ontario HSR station. SAN could arguably be used for Lindbergh Field and BUR for Burbank IFF there's a courtesy shuttle bus. MER for Castle Airport would only be appropriate if CHSRA acquires part of the BNSF row for that segment and a terminal for commercial passenger and/or cargo flights is constructed.

  4. How will these be priced relative to connecting short-hop flights?

    The question may not be all that relevant as most passengers will use HSR to connect to final destinations that are too close to be served by connecting flights. The exception will be those in the Central Valley, e.g. SFO - FYI (Fresno Yosemite, previously called FAT). However, those are far more expensive than HSR will be, so expect them to disappear from airline schedules quite quickly to free up slots for long-haul flights that can achieve high seat capacity utilization (aka "load factor"). Passengers will also prefer the trains because they will run more frequently, more than offsetting the longer trip time by cutting the layover interval.

  5. How will passengers get from the train platforms to their gates?

    In SFO's case, BART really does run into the airport. However, anyone arriving at Millbrae by Caltrain currently needs to transfer to BART, execute a cross-platform timed transfer at San Bruno and then a third transfer to the Air Train to reach the check-in counters. See here and here for the gory details.

    One of the reasons the BART shuttle between SFO and Millbrae was discontinued is that the unions insisted that it constituted a line in its own right, so drivers should be permitted to take a 15-minute break at the end of each journey. Alternatively, each train would have to be operated by two drivers, each twiddling their thumbs more than 50% of the time.

    Running the AirTrain out to Millbrae would be very expensive, so either a BART shuttle or a SamTrans (?) bus would have to be paid out of airport taxes if that station is to share the IATA code with the airport.

    At Ontario, the last mile transfer depends entirely on the right of way CHSRA can obtain through the San Gabriel Valley. The plan of record is to leverage the UPRR Colton alignment that runs right past the gigantic car park in front of the three terminals on S Moore Way and E Terminal Way, respectively. Given how spread out the terminals are, the most likely solution would be a shuttle bus or people mover that also serves long-term parking. This approach is still viable if HSR ends up in the I-10 median. However, if HSR were forced even further from this secondary airport, e.g. to the CA-60 median, it could not act as an effective feeder. In that case, it would make more sense to extend the starter line from Fullerton to Riverside and San Bernardino, with a view to one day reaching Las Vegas. Any money saved should then be put toward upgrading the Pacific Surfliner route to higher speeds or else, on a spur down to San Diego at Corona.

    In Palmdale, the existing terminal is located almost 3.5 miles from the Metrolink station. The most likely connection would be a shuttle bus. Of course, now that commercial operation has anyhow ceased, it might make sense to build a brand-new terminal near Sierra Hwy/Ave N with detour tracks for HSR trains at grade and check-in/baggage retrieval on a concourse level. Note that Palmdale could also serve as a high speed cargo transshipment point, as the northern terminus for HSR trains serving only Southern California and as a maintenance facility.

    In essence, much the same logic would apply for Castle Airport in Merced county - right now, there's a long runway and a nearby rail line but not much else.

    Remote secondary airports have little or no chance of commercial success without a high speed train station within walking distance of the airport concourse. Even then, some caution is in order: the spectacular Satolas station was built right next to the airport in Lyon, France, in the 1980s. The hope was that the TGV would attract additional passengers from south of Lyon to the airport such that airlines would offer more international flights.

    However, in one of France's worst transportation planning failures, SNCF/RFF never constructed the turn-off that would have permitted regional TGV service between downtown Lyon (Part-Dieu), the airport, the Rhône Valley and beyond. As a result, Lyon was never able to emerge from Paris' long shadow. In 2010, a new express light rail service will finally provide a 20-minute transit link between downtown and the airport but that's no more than a consolation prize.

    The lesson from Satolas is that a secondary airport without a substantial local catchment area will struggle to attract the flights that would prompt passengers to ride a train to the airport in the first place. It's a chicken-and-egg situation that can only be overcome with a plan for integrated service. This has to be driven by one or more innovative airlines collaborating closely with one or more rail operators to offer a combined service that is hassle-free, fast, punctual and competitively priced. The notion that a government agency like CHSRA or LAWA can "build it and they will come" is false.

  6. Where will check-in and security screening happen?

    Some operators in Europe (e.g. Deutsche Bahn) do provide flight check-in facilities at selected train stations, but all security screening still happens at the airport. In 2010, the European rail networks will be opened to international competition. At that point, Air France and others intend to compete directly with Eurostar on the London-Paris route, where baggage and passenger screening is already performed at the train stations because the UK is not a signatory to the Schengen agreement. However, the rail and airport security zones are currently not equally strict nor integrated, so passengers will still probably have to submit to screening twice.

    Afaik, no rail operator anywhere allows passengers to take care of flight check-in formalities on board the train to save time. Reliable wireless internet connections are still a new phenomenon and there are also logistical issues, e.g. with weighing bags.

    However, consider this scenario: you go online and book a train/flight combo ticket with XYZ airline, which has decided to operate out of a secondary airport with an integrated HSR station. You print out your ticket/write down your confirmation code. At the appropriate time, you board the train with your baggage. Once you're underway, you head to the cafe car, which features a courtesy desk where you can check in for your flight. In addition to your boarding pass(es), you receive self-adhesive baggage tags that you need to attach yourself. Upon arrival at the airport, you need only drop off your bags. The person there will check that your bags are in order (size, weight, condition) and scan the bar code before letting you proceed. The airline would not be responsible for lost bags prior to this point.

  7. Will baggage be checked through to the final destination?

    Train stations that permit combined train/plane check-in on the outbound leg also provide the boarding passes and baggage labels for the flight. However, in most cases passengers still have to take their bags onto the train themselves. One exception is Vienna, Austria, where you can check your bags the night before or, up to 75 minutes before the shuttle train leaves for the nearby airport. Baggage is forwarded automatically to the airport's handling facility. Returning passengers do have to pick up their bags at the baggage carousels as usual, though.

Tuesday, March 10, 2009

LA - San Diego: Quo Vadis?

NOTE: We've moved! Visit us at the California High Speed Rail Blog.

Note: commenter calwatch, a member of the Technical Working Group for the LA - San Diego segment of HSR, kindly contributed to the research for this post.

We recently discussed plans to completely remodel the overburdened Lindbergh Field airport and before that, the possibility of extending HSR to Mexico, because the SD Trolley Blue Line to the border is so busy.

Of course, both of these presumed that the planned HSR spur from LA Union Station to San Diego Santa Fe depot - or perhaps, a new multimodal transit hub at Lindbergh Field - will actually be built as intended. This requires that the starter line attract enough ridership to generate an operating profit that will permit the sale of non-state bonds to raise capital for phase II, which also includes extensions to Irvine and Sacramento. It also requires that CHSRA secure a suitable right of way, which will not be easy and needs to be done now, more than a decade before phase II construction will even begin.

Here is a map showing the principal railroad rights of way in Southern California (and their owners) plus several of the currently unused freeway medians. Despite appearances to the contrary, it does not represent a smorgasbord of options for HSR - the majority of them are already reserved for freight (expansion) and local/regional transit. At least the risky maglev project through the Inland Empire appears to have shrunk to just a gleam in a number of politicians' eyes: Sen. Harry Reid, Gov. Schwarzenegger and Gov. Gibbons. Rapid transit service between Anaheim ARTIC and Ontario airport via hwy 57 might be more easily implemented via a sexy bus styled by an F1 aerodynamicist and running at elevated speeds (90-150mph) on dedicated lanes and possibly even batteries. HSR is great, but it's not always the most appropriate option.


View Larger Map

Passenger rail service between LA and San Diego is currently provided by the popular Amtrak Pacific Surfliner that runs through Orange County and down the San Diego county coast. The trip takes about 2 hours.

HSR would cut that to 1h 15m, even though CHSRA has selected a preferred route via Riverside county that adds around 30 miles. There were three reasons for this preference:


  1. LAWA desperately wants to relieve California's largest airport LAX, where a project to add a third runway had to be canceled after protests from nearby communities. That is the primary reason why the HSR network includes both Palmdale and Ontario airports.
  2. San Bernardino, Riverside and other inland towns are currently only connected to LA via Metrolink, if at all. However, none of lines has a stop next to the airport terminals, the nearest large airport in the region.
  3. An HSR alignment along the coast ROW was ruled out because that is too narrow to support four tracks south of Fullerton in Orange County, because of the visual clutter an overhead catenary system would bring to San Clemente and Del Mar in particular and, because of concerns about weather-related and geological hazards that NCTD has had to deal with in the past. CHSRA recommended an upgrade to 110mph diesel-based service be considered but did not pursue the corridor any further.

The preference for a detour past Ontario airport and Riverside introduces several critical ROW issues:

  • CHSRA is proposing expensive run-through tracks (zoom in on LA please) for a new upper deck at LA Union Station. We have already discussed several alternatives that would require fewer eminent domain takings on this blog. For a variety of reasons, most commenters insisted that HSR trains should stop at Union Station, not at any separate station connected by a local shuttle service - especially one anywhere near the new State Historical Park. Any run-through tracks for HSR would be separate from the ones already planned for FRA-compliant Amtrak/Metrolink equipment on the lower deck. The objective is to secure alignments that allow trains to run from SF/Sacramento to both Anaheim and San Diego without having to waste time reversing direction in LA. Note that there are no plans for direct HSR service between Anaheim and San Diego because Amtrak Pacific Surfliner already serves that market.

  • Securing a ROW from LA Union Station to Riverside

  • Securing a ROW from Riverside to San Diego

  • Avoiding ROW conflicts with freight capacity expansion in Southern California. Fortunately, analysis to date suggests that a combination of expanding conventional rail freight and adding dedicated truck lanes on selected freeways would be a lot more more effective than an inland port served by a bleeding-edge electricity-guzzling freight maglev system in dealing with congestion and even air quality problems that are constraining growth in shipping volume.

This last point is really important, because 1 in 7 jobs in LA county depends on the ports. The majority of all manufactured goods imported from Asia into the US flows through the container terminals there and to point east via the Inland Empire. Already, rail freight up to Redondo Junction near downtown Los Angeles has been consolidated via the fully grade separated Alameda Corridor, freeing up old rights of way for projects such as the Harbor Subdivision Transit Corridor.

The success of freight consolidation has spawned a sequel dubbed Alameda Corridor East, with phase I already in progress. Its scope are improvements to 39 grade crossings the UPRR rights of way in the San Gabriel Valley between Redondo Junction and Pomona. The grade separation projects already completed did not anticipate the construction of HSR tracks, something CHSRA's consultant engineers HNTB (also selected for the SF peninsula) are aware of. Later phases will address the eastern section of the UPRR corridors out to Colton and beyond as well as the "91" corridor owned by BNSF, which CHSRA has identified as the preferred corridor between Redondo Junction to Fullerton. South to Anaheim and Irvine, the ROW is narrow and owned by Metrolink.

San Gabriel Valley
At this point, it looks increasingly unlikely that CHSRA can obtain land on the preferred UPRR Colton/Riverside and Colton ROWs for the purpose of constructing HSR tracks. The ROW choice is very much in flux, but right now leading candidates for alternatives out to Riverside appear to be, in no particular order:

  • I-10 median on an elevated alignment. The section between LA Union Station and El Monte is already occupied by a single track used by the Metrolink San Bernardino line. The most likely route would therefore involve air rights over UPRR's Colton/Riverside ROW between Redondo Junction and the I-605/hwy 60 interchange, then cutting up to I-10 alongside I-605. The all-essential connecting transit to cover the ~1/2 mile to the three Ontario airport terminals would likely be implemented either via shuttle buses or an elevated people mover.

    One big problem is that there is no easy way to cut across from Colton to the I-215 median, the preferred route down to San Diego. Colton, San Bernardino and Riverside all very much want a station in the area, but residents near March AFB in Moreno Valley are objecting. Note that Metrolink has plans for a new service out to Perris, Hemet and San Jacinto.

    An alternative would be to cut across to the I-15 median just east of Ontario instead, perhaps even via the long-term parking lot at Ontario, S Haven Ave and a short section of UPRR's Colton/Riverside ROW (e.g. via air rights). The alignment would then continue south to Murrieta via Corona and Lake Elsinore. An intermodal station with Metrolink might be possible if the existing one for Corona were moved about a mile east.

  • Hwy 60 median east of the 710 interchange. It is still unused all the way out to Riverside UC and connected to the preferred route down to San Diego via the I-215 median. Reaching it from Redondo Junction would be difficult if UPRR refuses to cede at least air rights on its Colton/Riverside ROW . Moreover, there are two competing applications for the hwy 60 median: the Eastside Light Rail project and, dedicated truck lanes to haul freight out of the LA/LB ports (though other freeways are also under consideration).

    For HSR, a bigger issue with this option is that hwy 60 runs a couple of miles south of Ontario airport. However, a sufficiently fast high-capacity shuttle bus service or people mover up S New Haven could link the HSR station, the East Ontario Metrolink station, the long-term parking lots and all three terminals. A suboptimal solution, but better than nothing.

    Both the I-15 and the I-215 medians are more easily reached via hwy 60 than via I-10.


Note that both solutions involve obtaining some co-operation, e.g. air rights, from UPRR to proceed south-east from Redondo Junction. The same safety/liability issues that railroad raised in the context of a serious derailment with debris fouling an adjacent HSR track also applies to air rights. What if a derailment were to damage a support column or portal? How would the accident be communicated fast enough to avoid a potentially catastrophic follow-on accident involving a high speed train with hundreds of people on board?

Earthquake safety may be more manageable, though land would be needed to install the support structures. That could prevent UPRR from laying down another track and/or jeopardize the safety of its employees hanging off railroad cars. UPRR may be a crufty old-fashioned railroad compared to BNSF, but they are profitable and they have been in operation for 146 years. They've almost certainly forgotten more about day-to-day railroad operations and off-design conditions than CHSRA's board members will ever know.

HSR isn't being built in a vacuum, it is being introduced into the pre-existing US railroad ecosystem (for lack of a better term). If it has not yet done so, CHSRA would be wise to retain the services of a recently retired senior railroad operations manager, because neither civil engineers like Mehdi Morshed nor foreign HSR vendors nor foreign HSR operators will be able to bring local knowledge of (antiquated) operating practices to bear in CHSRA's negotiations with the freight rail companies and FRA. You can't reach consensus until the other side is persuaded that you fully understand the concerns they are raising. Operations guys tend to trust their own, because nothing focuses the mind on safety like an injury or death on your watch.

I-15 Managed Lanes
Unfortunately, getting past Ontario is only half the battle. SANDAG is already constructing additional managed lanes in the I-15 median that CHSRA was counting on in the 20-mile stretch between Escondido and south of Miramar. This video animation shows how this "freeway within a freeway" will be accessed via high overpasses. To date, no provision has been made to accommodate HSR. One option now under consideration would use even taller overpasses to permit tracks running on an aerial alignment.

A third option would rely on a covered trench below the center lanes, supported by columns in the middle. If this visually and mechanically more appealing variation is chosen, it would be prudent to anticipate those future trenches now rather than destroy nearly 40 lane-miles of perfectly good freeway lanes later on. One option would be to deploy prefabricated concrete slabs that could be removed during and re-installed after HSR construction. Another option would be to bite the bullet now and construct those trenches sans tracks in anticipation of HSR construction a decade hence. Worst case, HSR does not happen and they would be re-purposed for some other transportation application (zero emissions lanes? water pipes?) The question is: who would pay for digging trenches now rather than later? Note that the spaces between the on- and off-ramps would serve as emergency access points every few miles, eliminating the need for a service tunnel. The Escondido station should probably be sited north of where the managed lanes begin.

Note also that might be possible to obtain land just west of I-15 to avoid having to deal with the managed lanes complication, but 20 miles is a long stretch.

Miramar, Lindbergh Field and beyond
Further south, yet more pitfalls await our intrepid HSR planners. There is as yet no easy solution for cutting over from the I-15 median to the existing railroad coast ROW owned by the San Diego Northern Railway. The closest approach is at Miramar, a Marine Air Corps Station. County voters rejected a proposal to ask the Marines to leave so the field could be converted to a new airport far from downtown.

That ROW is wide enough for four tracks near Lindbergh Field, of which two are already in use for FRA-compliant equipment operated by Amtrak, NCTD and BNSF. The other two are used by SD Trolley, i.e. light rail. Unless FRA grants a rapid rail waiver along the same lines as the one that will be needed in Orange County, the HSR tracks will most likely have to run on an aerial, see slide 22 of this presentation. It seems highly unlikely that this would introduce any clearance problems for aircraft if wind conditions force them to take off to the east or, that wake turbulence and jet exhausts would even be noticeable to HSR trains. However, the authors appear to have include HSR at the last minute as an afterthought: there is no 400m (1/4 mile) island platform for the HSR trains nor any pedestrian overpass to reach them - three would be needed. Fixing this at a later date would require a massive change to the transit terminal's signature wave roof, so it should be elevated some 25-30' before the architectural plans are finalized.

Otherwise, CHSRA will have to stick with plan A and somehow site its station at the beautiful historic Santa Fe Depot near downtown or else further south, e.g. near Petco Park.


View Larger Map">

Finally, HSR will need a yard for overnight train storage, perhaps even maintenance. If BNSF are amenable to the idea, one possible location would be all the way down in near the salt ponds near Main St/I-5 in Castle Park. That location would double as an HSR station for communities near the border.


View Larger Map